v19.0 Launch Preparation: User Execution Guide

Status: Ready for Execution Total Time Required: 4-6 hours (Phase 1 QA) + 4 weeks (Beta Testing) Prerequisites: All v19.0 documentation complete ✅


Overview

This guide walks you through exactly what you need to do to take CareConnect from current state to full public launch.

Your tasks are split into two phases:

  1. Phase 1: Final QA (4-6 hours of manual testing) - Do this first
  2. Phase 4: Beta Testing (4 weeks, 15-20 min/day) - Do this second

All documentation is complete. You just need to execute the procedures.


Quick Reference

Task Time Required Blocking? Document Reference
Phase 1: Production Environment Audit 2 hours Yes docs/operations/final-qa-procedures.md Section 1
Phase 1: User Journey Testing 2-3 hours Yes (Crisis + A11y) docs/operations/final-qa-procedures.md Section 2
Phase 1: Data Quality Review 1 hour Yes docs/operations/final-qa-procedures.md Section 3
Phase 1 Total 4-6 hours Yes
Beta Week 1: Invite-Only (10-20 users) 15 min/day Yes docs/operations/beta-testing-plan.md Phase 1
Beta Week 2: Expanded (50-100 users) 20 min/day Yes docs/operations/beta-testing-plan.md Phase 2
Beta Weeks 3-4: Public Soft Launch 20 min/day Yes docs/operations/beta-testing-plan.md Phase 3
Beta Total 15-20 hours over 4 weeks Yes

PART 1: Phase 1 Final QA (4-6 hours) - START HERE

Goal: Verify production is ready before inviting beta users.

When to do this: Before beta testing starts.

Document to follow: docs/operations/final-qa-procedures.md


Step 1.A: Production Environment Audit (2 hours)

1. Environment Variables Check (30 min)

What: Verify all required environment variables are set in production.

How:

  1. Log into Vercel dashboard
  2. Navigate to: Project → Settings → Environment Variables
  3. Open checklist: docs/operations/final-qa-procedures.md Section 1.1
  4. Verify each variable:
  5. NEXT_PUBLIC_SUPABASE_URL
  6. NEXT_PUBLIC_SUPABASE_PUBLISHABLE_KEY
  7. SUPABASE_SECRET_KEY
  8. SLACK_WEBHOOK_URL
  9. AXIOM_TOKEN
  10. AXIOM_ORG_ID
  11. AXIOM_DATASET
  12. (Full list in document)
  13. Cross-reference with .env.example file
  14. Confirm: No placeholder values (e.g., "your-token-here")

Pass criteria: All required variables present with real values.

If fail: Add missing variables in Vercel, redeploy.


2. Database Security Check (30 min)

What: Verify Row Level Security (RLS) policies protect your database.

How:

  1. Log into Supabase dashboard
  2. Navigate to: Authentication → Policies
  3. Confirm policies exist for:
  4. services table (public read, no write)
  5. organizations table (RLS enabled)
  6. organization_memberships table (RLS enabled)
  7. Run test commands from document Section 1.2:
# Test public read (should work)
curl -X GET 'https://[your-project].supabase.co/rest/v1/services?select=id,name&limit=1' \
  -H "apikey: [anon-key]"

# Test unauthorized write (should fail with 401/403)
curl -X POST 'https://[your-project].supabase.co/rest/v1/services' \
  -H "apikey: [anon-key]" \
  -d '{"name": "Test"}'

Pass criteria: Public can read, unauthorized writes blocked.

If fail: Enable RLS policies in Supabase, re-test.


3. Authentication Flow Testing (30 min)

What: Verify signup, login, and password reset work.

How:

  1. Go to production site (e.g., https://careconnect.ing)
  2. Test Signup:
  3. Navigate to signup page
  4. Create account: qa-test-[timestamp]@example.com
  5. Check: Email confirmation received?
  6. Click confirmation link
  7. Check: Redirected to dashboard/home?
  8. Test Login:
  9. Log in with test account
  10. Check: Session persists on page reload?
  11. Test Password Reset:
  12. Click "Forgot Password"
  13. Enter test email
  14. Check: Reset email received?
  15. Click reset link, set new password
  16. Check: Can log in with new password?

Pass criteria: All 3 flows complete without errors.

If fail: Check Supabase email templates, SMTP settings.


4. Security Headers Check (15 min)

What: Verify CSP and security headers are present.

How:

  1. Run in terminal:
    SECURITY_HEADERS_BASE_URL=https://careconnect.ing npm run validate:security-headers:runtime
    
  2. Confirm headers present:
  3. Content-Security-Policy
  4. X-Frame-Options
  5. X-Content-Type-Options
  6. Open production site in browser
  7. Open DevTools → Console
  8. Check: No CSP violation errors?

Pass criteria: All security headers present, no violations.

If fail: Check next.config.ts headers configuration.


5. Rate Limiting Check (15 min)

What: Verify API rate limiting is active (60 requests/minute).

How:

  1. Open production site
  2. Open DevTools → Network tab
  3. Perform same search 10+ times rapidly
  4. Check: Eventually get 429 status code?

Pass criteria: Rate limiting triggers after ~60 requests in 1 minute.

If fail: Check rate limiting middleware configuration.


6. Error Boundary Check (15 min)

What: Verify errors display gracefully, no crashes.

How:

  1. Test 404:
  2. Visit: https://careconnect.ing/nonexistent-page
  3. Check: Custom 404 page displays?
  4. Check: "Return Home" link works?
  5. Test Offline:
  6. DevTools → Network → Offline
  7. Try to search
  8. Check: Graceful error message (no crash)?
  9. Check: Offline indicator appears?
  10. Go back Online
  11. Check: Search works again?

Pass criteria: All errors handled gracefully, no white screens.

If fail: Check error boundary components, offline service worker.


Step 1.B: Critical User Journey Testing (2-3 hours)

Five test scenarios. Crisis and Accessibility are BLOCKING.


Journey 1: Crisis Search (15 min) - CRITICAL - MUST PASS

What: Verify crisis queries work perfectly.

Why critical: This is the #1 use case. Lives depend on it.

How:

  1. Go to production site
  2. Type: "suicide help" in search box
  3. Press Enter
  4. Verify checklist:
  5. [ ] Crisis warning banner appears at top
  6. [ ] Banner text: "If you're in immediate danger, call 911..."
  7. [ ] Distress Centre Kingston in top 3 results
  8. [ ] Phone number clickable: 613-544-1771
  9. [ ] Total time <5 seconds from query to result
  10. [ ] No errors in browser console

Pass criteria: All 6 checks pass. Zero tolerance for failure.

If fail: 🚨 BLOCKING - Fix immediately before any beta users.

Full test script: docs/operations/final-qa-procedures.md Section 2, Journey 1


Journey 2: General Search Flow (20 min)

What: Verify normal search works well.

How:

  1. Search for: "food bank"
  2. Open DevTools → Network tab
  3. Verify checklist:
  4. [ ] Results appear in <800ms (check Network timing)
  5. [ ] At least 5 results displayed
  6. [ ] Top 3 are relevant food banks:
    • Partners in Mission Food Bank
    • Loving Spoonful
    • The Table Community Food Centre (or similar)
  7. [ ] Service cards show complete info:
    • Name, description, phone, address, hours
  8. [ ] Map displays with markers
  9. [ ] Clicking map marker shows service name
  10. [ ] Filters work (if present)

Pass criteria: Search is fast, relevant, complete.

If fail: Check search scoring, service data completeness.

Full test script: docs/operations/final-qa-procedures.md Section 2, Journey 2


Journey 3: Accessibility Navigation (30 min) - HIGH PRIORITY - MUST PASS

What: Verify keyboard navigation and screen reader support.

Why critical: Legal requirement (WCAG 2.1 AA). Equity imperative.

Prerequisites:

  • Install screen reader:
  • Windows: NVDA (free download)
  • Mac: VoiceOver (built-in, Cmd+F5)
  • Linux: Orca

How:

Part 1: Keyboard Navigation (15 min)

  1. Close/ignore your mouse
  2. Press Tab key repeatedly
  3. Verify checklist:
  4. [ ] Can navigate entire site with Tab only
  5. [ ] Focus indicator visible on every element
  6. [ ] Focus order is logical (top to bottom, left to right)
  7. [ ] Never get "trapped" (can always Tab forward/backward)
  8. [ ] Can activate links/buttons with Enter key
  9. [ ] Can submit search with Enter key
  10. [ ] Shift+Tab moves backward correctly

Part 2: Screen Reader (15 min)

  1. Enable screen reader (NVDA: Ctrl+Alt+N, VoiceOver: Cmd+F5)
  2. Navigate to search input
  3. Verify checklist:
  4. [ ] Screen reader announces: "Search, edit text" or similar
  5. [ ] Typing query: Characters read aloud
  6. [ ] Submitting search: Results count announced ("12 results found")
  7. [ ] Navigating results: Service names and descriptions read
  8. [ ] ARIA labels are descriptive (not just "button" or "link")
  9. [ ] Skip links work ("Skip to main content")
  10. [ ] Form labels properly associated with inputs

Pass criteria: All keyboard and screen reader checks pass.

If fail: 🚨 BLOCKING - Fix accessibility issues before beta.

Full test script: docs/operations/final-qa-procedures.md Section 2, Journey 3


Journey 4: Mobile Experience (30 min)

What: Verify mobile usability.

How:

  1. Open production site on mobile phone (or DevTools mobile emulation)
  2. Verify checklist:
  3. [ ] Page loads in <5 seconds
  4. [ ] No horizontal scrolling required
  5. [ ] Text readable without zooming
  6. [ ] Search works on mobile keyboard
  7. [ ] Tap phone number → dialer opens (on real device)
  8. [ ] Tap email → email app opens
  9. [ ] Map is usable (pinch to zoom, pan with touch)
  10. [ ] Service cards readable at mobile width
  11. [ ] Touch targets large enough (no tiny buttons)

Pass criteria: Fully usable on mobile, no layout issues.

If fail: Fix responsive layout, touch targets.

Full test script: docs/operations/final-qa-procedures.md Section 2, Journey 4


Journey 5: Offline Mode (20 min)

What: Verify PWA offline functionality works.

How:

  1. Load production site normally
  2. Enable Airplane Mode (or DevTools → Network → Offline)
  3. Try to search for "housing help"
  4. Verify checklist:
  5. [ ] Offline indicator appears (banner, icon, toast)
  6. [ ] Search still executes (using IndexedDB cache)
  7. [ ] Results returned (~196 services available offline)
  8. [ ] Service details accessible
  9. [ ] Map shows cached locations (or "offline" state)
  10. Disable Airplane Mode
  11. Perform new search
  12. Verify checklist:
  13. [ ] Online indicator appears
  14. [ ] Search hits server (fresh data)
  15. [ ] Network requests resume (check DevTools)

Pass criteria: Offline mode works, online reconnection seamless.

If fail: Check service worker, IndexedDB sync.

Full test script: docs/operations/final-qa-procedures.md Section 2, Journey 5


Step 1.C: Data Quality Final Review (1 hour)


1. Data Completeness Audit (20 min)

What: Check for gaps in service data.

How:

  1. Open terminal
  2. Run data audit:
    cd /path/to/careconnect
    npm run audit:data
    
  3. Review output:
  4. Total services: Should be ~196
  5. Missing coordinates: Note count (should be <10%)
  6. Missing hours: Note count (should be <10%)
  7. Missing French translations: Note count
  8. Assess:
  9. Are gaps acceptable? (<10% missing data)
  10. If gaps too high: Prioritize top 20 services first

Pass criteria: <10% missing critical data (coords, hours).

If fail: Prioritize fixing top 20 high-traffic services.


2. Top 20 Services Verification (30 min)

What: Ensure most-searched services have complete, accurate data.

How:

  1. Open data/services.json in editor
  2. Find these 20 high-priority services (list in document Section 3.2):

Crisis (MUST be 100% complete): - Distress Centre of Kingston - Interval House of Kingston - Kingston Community Health Centre - Crisis Services - Sexual Assault Centre Kingston

Food Security: - Partners in Mission Food Bank - Loving Spoonful - The Table Community Food Centre - St. Vincent de Paul Food Bank

Housing: - Kingston Youth Shelter - Causeway Work Centre - Housing Help - Housing Help Centre - Kingston Home Base

Health: - Kingston Community Health Centre - Queen's Family Health Team - KFL&A Public Health - CMHA Kingston

Legal/Financial: - Legal Aid Ontario - Kingston - Employment and Education Centre - Ontario Works - Kingston - Community Legal Clinic

  1. For each service, verify 11 fields:
  2. [ ] Name (English)
  3. [ ] Name (French)
  4. [ ] Description (English)
  5. [ ] Description (French)
  6. [ ] Phone number (formatted: 613-XXX-XXXX)
  7. [ ] Email (if available)
  8. [ ] Website (https://..., working link)
  9. [ ] Address (complete: street, city, postal code)
  10. [ ] Coordinates (latitude, longitude)
  11. [ ] Hours (structured data OR "Call for hours")
  12. [ ] Access script (English + French)
  13. [ ] Verification level: L1+ (L2+ for crisis services)

Use tracking template from document Section 3.2.

Pass criteria: All 20 services have complete data. Crisis services are L2+.

If fail: Fill in missing data before beta.


3. Random Spot Check (10 min)

What: Verify data accuracy for random services.

How:

  1. Pick 5 random services from data/services.json
  2. For each:
  3. Visit website URL (is it still active?)
  4. Check phone number format (correct?)
  5. Verify coordinates on Google Maps (accurate location?)
  6. Check description (still current? no outdated info?)

Pass criteria: No major data errors found.

If fail: Note errors, fix high-priority services.


Phase 1 Completion Checklist

Before proceeding to beta testing, confirm ALL of these:

Production Environment ✅

  • [ ] All environment variables verified and correct
  • [ ] Database RLS policies active and tested
  • [ ] Auth flows working (signup, login, password reset)
  • [ ] Security headers present (CSP, X-Frame-Options)
  • [ ] CORS configuration allows API requests
  • [ ] Rate limiting active (60 req/min triggers 429)
  • [ ] Error boundaries display gracefully

Critical User Journeys ✅

  • [ ] Journey 1: Crisis Search works perfectly (<5 sec, banner appears) BLOCKING
  • [ ] Journey 2: General Search returns relevant results (<800ms)
  • [ ] Journey 3: Accessibility works (keyboard + screen reader) BLOCKING
  • [ ] Journey 4: Mobile experience functional
  • [ ] Journey 5: Offline mode works

Data Quality ✅

  • [ ] Data audit run, gaps <10%
  • [ ] Top 20 services have complete data (11 fields each)
  • [ ] All crisis services verified L2+ with accurate contact info
  • [ ] Random spot check passed (5 services)

Observability Ready ✅

  • [ ] /admin/observability dashboard accessible
  • [ ] Axiom metrics flowing
  • [ ] Slack alerts configured
  • [ ] Circuit breaker monitoring active
  • [ ] SLO tracking operational

If all checked:READY FOR BETA TESTING

If any BLOCKING items failed: 🚨 FIX BEFORE PROCEEDING

Estimated time: 4-6 hours total


PART 2: Phase 4 Beta Testing (4 weeks) - DO THIS SECOND

Goal: Test with real users in controlled phases before full launch.

When to do this: After Phase 1 QA passes all checks.

Document to follow: docs/operations/beta-testing-plan.md


Week 1: Invite-Only Beta (10-20 users)

Goal: Test with trusted community partners. Find critical bugs.


Day 1: Recruit Beta Users (1-2 hours)

What: Invite 10-20 trusted users to test the platform.

Who to invite:

  • Community partners (social workers, case managers)
  • Library staff (Isabel Turner, Calvin Park, Pittsburgh branches)
  • Service providers (5-8 organizations)
  • Trusted community advocates

How:

  1. Open: docs/operations/beta-testing-plan.md Section: "Phase 1 Recruitment"
  2. Find email invitation template
  3. Customize with your information:
  4. Replace [Platform Name] → CareConnect
  5. Replace [Your Name] → Your name
  6. Replace [Link] → Production URL
  7. Send to each person individually (personalize!)
  8. Attach: User guide (docs/user-guide.md or share /user-guide link)
  9. Track responses in Beta User Tracking Spreadsheet (template in document)

Target: 10-20 confirmed beta users

Template provided - just fill in blanks.


Days 2-7: Daily Monitoring (15 min/day)

What: Check platform health and collect feedback daily.

Daily routine (every day, ~15 min):

  1. Check Feedback Channels (5 min):
  2. [ ] In-app feedback widget: Any new submissions?
  3. [ ] Email (feedback@careconnect.ing): Any messages?
  4. [ ] Note feedback in tracking spreadsheet

  5. Check Observability Dashboard (5 min):

  6. [ ] Visit /admin/observability
  7. [ ] Uptime: >99%? (should be green)
  8. [ ] Error rate: <2%? (should be low)
  9. [ ] Any Slack alerts? (check Slack channel)

  10. Review Error Logs (5 min):

  11. [ ] Supabase dashboard → Logs
  12. [ ] Any crashes or 500 errors?
  13. [ ] Note any patterns

Use checklist: docs/operations/beta-testing-plan.md Section: "Phase 1 Daily Monitoring"

If critical bug found (P0):

  • Fix immediately (<24 hours)
  • Notify beta users when resolved
  • Use template from docs/operations/beta-feedback-analysis.md

Day 7: Week 1 Review (1 hour)

What: Analyze feedback, decide if ready for Week 2.

How:

  1. Review all feedback (30 min):
  2. Open tracking spreadsheet
  3. Categorize each item:
    • Type: Bug, Feature, UX, Data, Performance, Accessibility, Positive, Other
    • Priority: P0 (critical), P1 (high), P2 (medium), P3 (low)
  4. Use criteria from docs/operations/beta-feedback-analysis.md Section: "Priority Levels"

  5. Check exit criteria (15 min):

  6. [ ] <5 P0 bugs discovered total
  7. [ ] All P0 bugs fixed
  8. [ ] Uptime >99% for the week
  9. [ ] Error rate <2% average
  10. [ ] Positive feedback from >70% of users

  11. Decide next step (15 min):

  12. If all criteria met: ✅ Proceed to Week 2 (Expanded Beta)
  13. If not met: ⏸️ Extend Week 1, fix issues, re-check in 3 days

Weekly review template: docs/operations/beta-testing-plan.md Section: "Week 1 Review"


Week 2: Expanded Beta (50-100 users)

Goal: Test with larger user base. Validate performance at scale.


Day 8: Expand Recruitment (1 hour)

What: Invite broader community to join beta.

Who to invite:

  • Student volunteers (Queen's University, SLC)
  • Community leaders
  • General public via community boards
  • Social service users

How:

  1. Use recruitment template: docs/operations/beta-testing-plan.md Section: "Phase 2 Recruitment"
  2. Post to:
  3. Community bulletin boards (physical + online)
  4. Community partner newsletters
  5. Social media (low-key post, not promoted)
  6. Email community organizations
  7. Track sign-ups in spreadsheet

Target: 50-100 total beta users (including Week 1 users)


Days 9-14: Daily Monitoring (20 min/day)

What: Monitor with increased attention to performance.

Daily routine (every day, ~20 min):

  1. Check Feedback (5 min): Same as Week 1

  2. Check Observability (10 min):

  3. [ ] Uptime: >99%?
  4. [ ] Error rate: <1%? (tighter than Week 1)
  5. [ ] Performance: p95 latency <800ms?
  6. [ ] Traffic patterns: Any spikes or unusual behavior?
  7. [ ] Check SLO compliance card

  8. Review Search Quality (5 min):

  9. [ ] Look at top search queries (aggregate, privacy-safe)
  10. [ ] Are users finding what they need?
  11. [ ] Any common failed searches?

Use checklist: docs/operations/beta-testing-plan.md Section: "Phase 2 Daily Monitoring"


Day 14: Week 2 Review (1 hour)

What: Assess readiness for public soft launch.

Check exit criteria:

  • [ ] <10 P1 bugs discovered (can have some P2/P3)
  • [ ] All P0 bugs fixed
  • [ ] All P1 bugs fixed
  • [ ] Platform handles 50+ concurrent users
  • [ ] Performance: p95 latency <800ms consistently
  • [ ] Error rate <1%
  • [ ] Positive feedback from >75% of users

If all met: ✅ Proceed to Weeks 3-4 (Public Soft Launch)

If not: ⏸️ Extend Week 2, address issues


Weeks 3-4: Public Soft Launch (Unlimited Users)

Goal: Open to public. Monitor at scale. Prepare for full launch.


Day 15: Low-Key Public Announcement (30 min)

What: Make platform publicly available without big fanfare.

How:

  1. Update site:
  2. Remove any "Beta" banners (if present)
  3. Update status to "Available"

  4. Announce (low-key):

  5. Social media post (organic, not paid): "CareConnect is now available to help you find local services..."
  6. Email to community partners
  7. Word-of-mouth through beta users
  8. Community partner newsletters

  9. DON'T do:

  10. Press release (save for full launch)
  11. Paid advertising
  12. Big promotional campaign

Template: docs/operations/beta-testing-plan.md Section: "Phase 3 Announcement"


Days 16-28: Daily Monitoring (15-20 min/day)

What: Monitor real-world usage at scale.

Daily routine (every day, ~15-20 min):

  1. Check Observability Dashboard (10 min):
  2. [ ] Visit /admin/observability
  3. [ ] Uptime: >99.5%? (tighter SLO)
  4. [ ] Error rate: <0.5%? (tighter SLO)
  5. [ ] Latency p95: <800ms?
  6. [ ] Circuit breaker: CLOSED? (green)
  7. [ ] SLO compliance: All green?
  8. [ ] Any Slack alerts?

  9. Process Feedback (5-10 min):

  10. [ ] Check all feedback channels
  11. [ ] Triage new feedback (type + priority)
  12. [ ] Add to tracking spreadsheet
  13. [ ] Create GitHub issues for P0/P1 bugs

  14. Weekly Pattern Check (Mondays, extra 15 min):

  15. [ ] Review traffic trends
  16. [ ] Top search queries (any surprises?)
  17. [ ] User retention (are beta users returning?)
  18. [ ] Any emerging patterns?

Use checklist: docs/operations/beta-testing-plan.md Section: "Phase 3 Daily Monitoring"

Response times:

  • P0 bugs: Fix immediately (<24 hours)
  • P1 bugs: Fix within 3 days
  • P2 bugs: Fix before full launch
  • P3 bugs: Backlog for post-launch

Day 28: Launch Readiness Assessment (2 hours)

What: Complete scorecard to decide if ready for full public launch.

How:

  1. Complete Launch Readiness Scorecard (1 hour):
  2. Open: docs/operations/beta-feedback-analysis.md Section: "Launch Readiness Scorecard"
  3. Score 7 categories on scale of 1-5:
Category Weight Your Score Pass?
Stability 25% ___/5 ✓/✗
User Satisfaction 20% ___/5 ✓/✗
Performance 15% ___/5 ✓/✗
Data Quality 15% ___/5 ✓/✗
Accessibility 10% ___/5 ✓/✗
Search Quality 10% ___/5 ✓/✗
Feedback Response 5% ___/5 ✓/✗

Scoring guide: - 5 = Excellent (exceeds expectations) - 4 = Good (meets all targets) - 3 = Acceptable (minor issues) - 2 = Needs work (major issues) - 1 = Not ready (critical problems)

  1. Calculate weighted score (15 min):
  2. Multiply each score by weight
  3. Sum all weighted scores
  4. Example: (5 × 0.25) + (4 × 0.20) + ... = Final Score

  5. Make launch decision (45 min):

  6. Score >4.0:READY FOR FULL PUBLIC LAUNCH
  7. Score 3.5-4.0: ⚠️ Address concerns, then launch
  8. Score 3.0-3.5: ⏸️ Extend soft launch, fix major issues
  9. Score <3.0: 🚫 Not ready, significant work needed

Scorecard template: docs/operations/beta-feedback-analysis.md


Beta Testing Completion Checklist

Before full public launch, confirm:

  • [ ] Week 1 complete: 10-20 users, <5 P0 bugs, all fixed
  • [ ] Week 2 complete: 50-100 users, <10 P1 bugs, all fixed
  • [ ] Weeks 3-4 complete: Public soft launch, 2+ weeks stable
  • [ ] Uptime: >99.5% for final 2 weeks
  • [ ] Error rate: <0.5% for final 2 weeks
  • [ ] Performance: p95 <800ms consistently
  • [ ] All P0/P1 bugs fixed
  • [ ] Launch Readiness Scorecard: >4.0
  • [ ] User feedback: Majority positive

If all checked:READY FOR FULL PUBLIC LAUNCH

Total beta time: 4 weeks, ~15-20 hours total effort


PART 3: Full Public Launch (After Beta)

When: After Launch Readiness Scorecard >4.0


Launch Day Actions (2-3 hours)

1. Final Pre-Launch Check (30 min)

One more quick verification:

  • [ ] Run critical user journey tests (5 scenarios)
  • [ ] Check /admin/observability - all green?
  • [ ] Verify no open P0/P1 bugs
  • [ ] Check Slack alerts configured
  • [ ] Confirm rollback procedures accessible

2. Public Announcement (1 hour)

Announce broadly:

Option A: Full Announcement

  • Press release to local media
  • Social media campaign (promoted posts)
  • Email to all community partners
  • Post to community boards city-wide
  • Community radio/TV (if available)

Option B: Gradual Announcement

  • Social media posts (organic + promoted)
  • Email to community partners
  • Word-of-mouth expansion
  • Local news if they reach out

Choose based on your capacity and goals.

Templates available (optional): docs/planning/v19-0-launch-preparation.md Phase 5


3. Launch Day Monitoring (4 hours, first 4 hours critical)

Follow: docs/operations/launch-monitoring-checklist.md

First 4 hours (every 30 min):

  1. Quick check (10 min each):
  2. [ ] Visit /admin/observability dashboard
  3. [ ] Check Slack for alerts
  4. [ ] Review top search queries
  5. [ ] Check error rate (<0.5%)
  6. [ ] Verify latency (<800ms p95)

  7. Every hour (deep dive, 15 min):

  8. [ ] Performance analysis (p50/p95/p99)
  9. [ ] Traffic analysis (spikes? patterns?)
  10. [ ] Data quality spot check
  11. [ ] User feedback review

Hours 4-24 (every 2 hours):

  • Standard check (10 min)
  • Dashboard review
  • Alert review
  • Trend analysis

Full checklist: docs/operations/launch-monitoring-checklist.md


4. If Issues Arise (As Needed)

Use rollback procedures if critical issue found:

Severity 1 (SEV-1): Critical Bug

  • Symptoms: Search broken, auth failing, data loss risk
  • Response: <5 minutes
  • Action: Immediate rollback via Vercel
  • Follow: docs/operations/launch-rollback-procedures.md SEV-1 procedure

Severity 2 (SEV-2): High Error Rate

  • Symptoms: Error rate >5%, users reporting issues
  • Response: <15 minutes
  • Action: Try quick fix (5 min), then rollback if no improvement
  • Follow: docs/operations/launch-rollback-procedures.md SEV-2 procedure

Severity 3 (SEV-3): Performance Degradation

  • Symptoms: p95 latency >1500ms, slowness reports
  • Response: <30 minutes
  • Action: Evaluate root cause, attempt optimization, rollback if persistent
  • Follow: docs/operations/launch-rollback-procedures.md SEV-3 procedure

Full rollback procedures: docs/operations/launch-rollback-procedures.md


Post-Launch Week (Days 2-7)

Daily monitoring (15 min/day):

  • Check observability dashboard
  • Review SLO compliance
  • Process user feedback
  • Monitor for issues

Weekly review (Day 7, 1 hour):

  • Assess first week performance
  • Review all feedback
  • Identify improvements
  • Celebrate successes!

Use checklist: docs/operations/launch-monitoring-checklist.md Section: "Post-Launch Week"


Summary: Your Complete Action Plan

Phase 1: Final QA (4-6 hours) START HERE

  1. Production environment audit (2 hours)
  2. Critical user journey testing (2-3 hours)
  3. Data quality review (1 hour)
  4. Must pass all blocking criteria

Week 1: Invite-Only Beta (10-20 users)

  1. Day 1: Recruit users (1-2 hours)
  2. Days 2-7: Daily monitoring (15 min/day)
  3. Day 7: Week 1 review (1 hour)

Week 2: Expanded Beta (50-100 users)

  1. Day 8: Expand recruitment (1 hour)
  2. Days 9-14: Daily monitoring (20 min/day)
  3. Day 14: Week 2 review (1 hour)

Weeks 3-4: Public Soft Launch

  1. Day 15: Low-key announcement (30 min)
  2. Days 16-28: Daily monitoring (15-20 min/day)
  3. Day 28: Launch readiness assessment (2 hours)

Full Public Launch (After scorecard >4.0)

  1. Final pre-launch check (30 min)
  2. Public announcement (1 hour)
  3. Launch day monitoring (first 4 hours critical)
  4. Post-launch week monitoring (15 min/day)

Time Investment Summary

Phase Time Required When
Phase 1 QA 4-6 hours one-time Before beta
Week 1 Beta ~2.5 hours Week 1
Week 2 Beta ~3.5 hours Week 2
Weeks 3-4 Soft Launch ~5 hours Weeks 3-4
Launch Day 5-6 hours Launch day
Total ~20-25 hours over 5+ weeks

Most time is daily monitoring (15-20 min/day) spread across weeks.


All Documents Reference

Document Purpose When to Use
This guide High-level execution plan Always - your roadmap
docs/operations/final-qa-procedures.md Detailed Phase 1 QA steps Phase 1 (4-6 hours)
docs/operations/beta-testing-plan.md Detailed beta procedures Weeks 1-4 (beta)
docs/operations/beta-feedback-analysis.md Feedback management Throughout beta
docs/operations/launch-monitoring-checklist.md Launch day monitoring Launch day + Week 1
docs/operations/launch-rollback-procedures.md Emergency rollback If critical issue
docs/operations/communication-templates.md Incident communication If issues arise
docs/user-guide.md User documentation Share with beta users
docs/faq.md Frequently asked questions Share with users

Questions & Troubleshooting

"What if I find a critical bug during QA?"

  • Stop. Don't proceed to beta.
  • Fix immediately.
  • Re-test that specific scenario.
  • Verify no regressions.
  • Then continue QA.

"What if crisis search doesn't work?"

  • This is BLOCKING. Do not proceed to beta under any circumstances.
  • Fix immediately before any users access the platform.
  • Lives depend on this working perfectly.

"What if accessibility fails?"

  • This is BLOCKING. Legal requirement (WCAG 2.1 AA).
  • Fix before beta.
  • Re-test with keyboard and screen reader.
  • Verify all interactions work without mouse.

"What if I can't recruit beta users?"

  • Quality over quantity. Start with 5-10 trusted users.
  • Week 1 can be smaller if needed.
  • Extend Week 1 instead of rushing to Week 2.
  • Key: Get diverse feedback (different use cases, devices, accessibility needs).

"What if I don't have time for daily monitoring?"

  • Daily monitoring is critical during beta.
  • 15-20 min/day is minimum safe amount.
  • If truly unavailable: Extend beta phases (Week 1 = 2 weeks, etc.)
  • Don't skip - monitoring prevents disasters.

"Can I skip beta testing entirely?"

  • Not recommended. Beta testing finds issues before public sees them.
  • If you must: At minimum, do Week 1 with 5-10 trusted users.
  • Risk: Public launch with unknown bugs = bad user experience.

"What if scorecard is <4.0?"

  • Don't launch yet.
  • Review low-scoring categories.
  • Fix major issues.
  • Extend soft launch 1-2 weeks.
  • Re-assess scorecard.
  • Launch when ready (>4.0), not on schedule.

"What if there's a critical issue on launch day?"

  • Stay calm.
  • Follow rollback procedures in docs/operations/launch-rollback-procedures.md
  • SEV-1 = rollback in <5 minutes via Vercel dashboard
  • Communicate using templates in docs/operations/communication-templates.md
  • Fix issue, re-deploy, monitor closely.

Success Indicators

You're on track if:

  • ✅ Phase 1 QA passes all blocking criteria
  • ✅ Week 1 beta: <5 P0 bugs, all fixed
  • ✅ Week 2 beta: <10 P1 bugs, all fixed
  • ✅ Soft launch: Uptime >99.5%, error rate <0.5%
  • ✅ Users report positive experiences
  • ✅ No accessibility complaints
  • ✅ Crisis search works perfectly every time
  • ✅ Launch readiness scorecard >4.0

You're ready to launch when:

  • ✅ All above indicators met
  • ✅ 2+ weeks of stable soft launch
  • ✅ All P0/P1 bugs fixed
  • ✅ Team feels confident
  • ✅ Rollback procedures tested and understood

Final Checklist Before You Start

Prerequisites:

  • [ ] All v19.0 documentation complete ✅
  • [ ] Production site deployed and accessible
  • [ ] /admin/observability dashboard accessible
  • [ ] Slack alerts configured
  • [ ] You have 4-6 hours available for Phase 1 QA
  • [ ] You can commit 15-20 min/day for 4 weeks (beta)
  • [ ] You've read this entire guide
  • [ ] You understand the process

If all checked:You're ready to start Phase 1 QA!

Next step: Open docs/operations/final-qa-procedures.md and begin Section 1.1 (Environment Variables Check).


Document Version: 1.0 Last Updated: 2026-02-09 Status: Ready for User Execution Estimated Total Time: 20-25 hours over 5+ weeks Start Here: Phase 1 Final QA → docs/operations/final-qa-procedures.md