This document defines the minimum evidence package needed to close user-owned Gate 0 blockers.

Use with:

  1. v22.0 Gate 0 User Action Tracker
  2. v22.0 Gate 0 Evidence Status (2026-03-09)
  3. v22.0 Gate 0 Exit Checklist (Decision Control)
  4. v22.0 Integration Feasibility Decision Record
  5. v22.0 Gate 0 Evidence Sync Runbook

Rules:

  1. Do not mark any blocker complete unless all minimum evidence checks pass.
  2. Evidence must be dated and attributable (owner/reviewer).
  3. No fabricated evidence or inferred closure is allowed.
  4. Canonical drop locations for new submissions live under v22.0 Gate 0 Evidence Workspace.
  5. Prefer dated filenames so later gate reviews can trace the exact evidence bundle used.

Submission template:

Submission ID: C1-YYYYMMDD
Submitted by:
Date:
Partner artifact bundle location:
Included artifacts:
- Contract terms
- API terms
- Relevant addenda

Clause review outcomes:
- C1-1 (raw query text): pass/fail + note
- C1-2 (forced identifying telemetry): pass/fail + note
- C1-3 (re-identification requirement): pass/fail + note
- C1-4 (privacy-first standards conflict): pass/fail + note

Final legal recommendation: acceptable | acceptable_with_conditions | not_acceptable
Reviewer:

Suggested drop location:

  1. v22.0 Evidence Workspace / C1

Suggested dated artifacts:

  1. C1-YYYYMMDD-submission.md
  2. C1-YYYYMMDD-clause-matrix.md
  3. C1-YYYYMMDD-artifact-inventory.md
  4. Raw source artifacts (PDF, HTML export, or markdown notes) used for the review

Supporting templates:

  1. C1 Submission Template
  2. C1 Clause Matrix Template

Minimum evidence checks:

  • [ ] Partner legal/API terms bundle is attached and accessible.
  • [ ] Clause-level outcomes are provided for C1-1 through C1-4.
  • [ ] Any failed clause includes explicit rejection rationale.
  • [ ] Final legal recommendation is present and signed.

Pass rule:

  1. All checks above are complete.
  2. C1-3 is explicitly resolved with no unresolved requirement.

Intake Template: UA-2 / G0-4 (C2 Retention + Deletion)

Submission template:

Submission ID: C2-YYYYMMDD
Submitted by:
Date:
Policy artifact location:

Field-level policy table:
- field:
  retention_window:
  deletion_trigger:
  deletion_executor:
  verification_evidence:

Privacy sign-off:
- Reviewer:
- Date:
- Decision: approved | approved_with_conditions | rejected

Suggested drop location:

  1. v22.0 Evidence Workspace / C2

Minimum evidence checks:

  • [ ] Retention window defined for every allowed integration field.
  • [ ] Deletion trigger and deletion executor defined for every allowed field.
  • [ ] Verification evidence attached for deletion path behavior.
  • [ ] Privacy sign-off included with reviewer/date/decision.

Pass rule:

  1. No allowed field remains pending policy lock.
  2. Privacy sign-off decision is approved or approved_with_conditions.

Intake Template: UA-3 / G0-8 (D4 Partner Ops Execution)

Submission template:

Submission ID: D4-YYYYMMDD
Submitted by:
Date:
Pilot partner list artifact:
Outreach owner:
Execution evidence bundle:
- outreach log
- dated contact attempts
- outcomes/status notes

Coverage note:
- Number of partners targeted:
- Number of organizations targeted:
- Gaps remaining:

Suggested drop location:

  1. v22.0 Evidence Workspace / D4

Suggested dated artifacts:

  1. D4-YYYYMMDD-submission.md
  2. D4-YYYYMMDD-partner-list.md
  3. D4-YYYYMMDD-outreach-log.csv
  4. D4-YYYYMMDD-coverage-note.md
  5. Any dated screenshots, email exports, or CRM notes used as supporting evidence

Supporting templates:

  1. D4 Submission Template
  2. D4 Partner List Template
  3. D4 Outreach Log Template

Minimum evidence checks:

  • [ ] Named pilot partner list is attached.
  • [ ] Outreach owner is explicitly identified.
  • [ ] Dated execution evidence bundle is attached.
  • [ ] Coverage note includes targeted counts and any remaining gaps.

Pass rule:

  1. All checks above are complete.
  2. Evidence aligns with D4 target range and is sufficient for audit traceability.

Acceptance and Sync Steps

After any accepted submission:

  1. Update status row in v22.0 Gate 0 User Action Tracker.
  2. Sync the corresponding control/evidence docs (C1 or C2, plus approval checklist for D4).
  3. Sync v22.0 Gate 0 Evidence Status (2026-03-09).
  4. Re-evaluate v22.0 Gate 0 Exit Checklist (Decision Control).
  5. Re-run gate check (npm run check:v22-gate0).

Detailed operator sequence:

  1. v22.0 Gate 0 Evidence Sync Runbook