CareConnect Closeout Triage Checkpoint (2026-07-01)
This checkpoint records the safe autonomous triage pass after the auth/admin regression work and cross-repo security audit closeout. It is intentionally a decision aid, not a new feature plan.
Evidence Reviewed
- Current repo state:
mainis clean and even withorigin/main. - GitHub state: no open pull requests.
- Latest GitHub Actions on
main: CI, Platform Ops Integration, Deploy Documentation, and Pages deployment are passing. - Open GitHub issues:
#13Monthly Crisis Service Verification - June 2026.#14Q2 2026 General Service Verification.#28Gate 0 G0-3 legal/API terms evidence.#29Gate 0 G0-8 partner operations evidence.- Validation:
npm run check:v22-evidencepasses.npm run check:v22-gate0exits non-zero as expected because Gate 0 is stillNO-GOwith blockersG0-3andG0-8.npm run check:refspasses.- Limited-pilot disposition:
- The 2026-07-02 owner self-review records that a constrained public directory pilot may continue without treating that as legal approval.
- Full partner/API Gate 0 remains
NO-GOpending C1 and D4 evidence. - Current code markers:
- No current actionable
TODO/FIXMEwas found in active app code that should interrupt Gate 0 triage. - The only active skipped test patterns found are credential-gated RLS integration tests.
Done
| Area | Current disposition | Evidence |
|---|---|---|
| Auth callback and login redirect regression coverage | Done | Unit tests cover safe next handling, localized callback wiring, and rejection of localhost/protocol-relative redirects. |
| Admin dashboard regression coverage | Done | Component and local/staging browser-smoke coverage guard against the response-envelope rendering failure that caused the recent client exception. |
| Reindex guardrail proof path | Done for current closeout | Admin reindex route/proof tests and the authenticated production proof are recorded in the private operations audit evidence. |
| PLAN-032 public repo side | Done | Tests and roadmap status are in this repo; private production smoke execution remains private-ops gated. |
| CI health | Done | Latest main-branch workflows are green. |
Closed In This Workstream
These closeout items are done and should not be reopened in this workstream unless a new regression appears:
- Repos were left clean, pushed, and even with
origin/main. - CareConnect active implementation is paused while Gate 0 evidence is still missing.
- The completed auth/admin regression and restricted production-automation work is documented and handed off.
- Live auth/admin smoke and automated production reindex smoke are explicitly deferred, not treated as forgotten work.
- The remaining work is now roadmap-owned rather than closeout-owned.
- The limited public-directory disposition is recorded as a constraints-based owner decision, not as full Gate 0 closure.
Finish Now
These are the only items that should be treated as finish-now candidates before closing this workstream:
- Decide whether the current app state is sufficient to pause CareConnect implementation until Gate 0 evidence arrives.
- If a small final pass is desired, keep it limited to user-visible correctness checks that do not create new scope:
- run focused login/admin/search/service-detail tests,
- update stale documentation that contradicts current behavior,
- fix only clear regressions discovered by those checks.
- Keep all production auth-smoke or reindex-smoke automation deferred unless explicitly selected as part of triage.
Defer
These items are useful, but they should not pull the project away from Gate 0:
- Live authenticated auth/admin smoke automation using a synthetic mailbox.
- Automated production reindex guardrail smoke. This starts real production work and requires explicit approval each time.
- Full local Playwright browser execution. Keep browser execution in CI/manual unless debugging a browser-only regression.
- Broad UI polish that does not affect launch safety, admin reliability, or user-facing correctness.
- Remaining DB migration-history cleanup:
- setup guidance that still references direct schema application,
- seed-path mismatch cleanup,
- fresh generated Supabase type validation.
- Advanced French service-data enrichment beyond the already completed French access-script merge.
- Admin-facing data-quality dashboard.
Human-Owned
These cannot be completed autonomously from repo evidence alone:
G0-3 / C1: attach candidate partner legal/API terms and complete clause-level review. The 2026-07-02 owner self-review permits only the constrained public-directory pilot and does not close C1.G0-8 / D4: attach named pilot partner list, outreach owner assignments, and dated execution evidence.- Monthly crisis-service verification.
- Quarterly general-service verification.
- Provider-console changes and any action requiring private credentials.
- Any decision to create synthetic mailbox credentials for live auth smoke.
Recommended Triage Decision
Treat CareConnect as technically stable enough to pause active implementation and continue only the constrained public-directory pilot. The next strategic blocker is not more app code; it is Gate 0 evidence.
Recommended state:
- Finish now: no additional repo implementation unless a concrete regression is found.
- Defer: PLAN-032 live auth smoke and reindex automation.
- Human-owned next: close or update issues
#28,#29,#13, and#14only when real evidence exists.
Validation Commands
Use this small validation set for any final no-code triage pass:
Expected result:
check:refspasses.check:v22-evidencepasses.check:v22-gate0exits non-zero whileG0-3andG0-8remain unresolved.